Search Results

2497 Results Found

8.16.020 A. Classification. The streets or portions thereof of the City are declared to be and are divided and classified into two groups and shall henceforth be known as and regulated as to heavy traffic by the names of such two groups, together with regulations pertaining thereto as set forth in this section. Such two groups...

Truck Route Map Arrow Highway, from the westerly City Limits to Benson Avenue; Palo Verde Street from Monte Vista Avenue to Central Avenue; Holt Boulevard, from Mills Avenue to Central Avenue; Mission Boulevard, from the westerly City Limits to Central Avenue; Monte Vista Avenue, from Palo Verde Street to the northerly City Limits; Central Avenue,...

One-Day Use permits are valid for only 24-hours for any period between 12:00am to 6:00am the next day. These limitations may vary depending on the size of the load and road conditions. If the applicant is unable to meet the proposed schedule approved on the permit, the applicant is required to contact the Public Works...

The applicant or the applicant's agent shall sign a statement agreeing to preserve and save the City, and each officer and employee thereof, from any liability or responsibility for any accident, loss or damage to persons or property happening or occurring as the proximate result of the applicant's activities pursuant to the permit for which...

12.010 No person shall move any load over, along or across any street within the City when the weight and/or size of the load, plus the weight and/or size of the vehicle or equipment, exceeds the limitations of the Vehicle Code of the State, except that, where it is impractical to change the physical characteristics...

Trucks over 17 feet high and 16 feet wide; or 75 feet long require a pilot car. One Pilot Car Any vehicle with a single kingpin combination between 75 feet and 100 feet. Any vehicle combination of truck, tractor, and jeep/semi-trailers coupled together (multi-kingpin) exceeding 120 feet. Any vehicle combination of truck, tractor, jeep, and...

Instructions When applying for a transportation permit, please allow at least 24 hours for processing. The City of Montclair is closed every Friday, so permit requests for moves after Thursday should be made no later than Wednesday to allow time for processing, payment, and pickup. City Hall is also closed for most Federal holidays and...

Improvements will include the installation and/or enhancement of sidewalks, bike lanes, crosswalks, ADA curbs, signage, and traffic control signage with rapid flashing beacons. These enhancements will impact Montclair High School, Montera Elementary, and Monte Vista Elementary Schools. Traffic safety measures and devices per the Manual of Uniform Traffic Control Devices (MUTCD) and signs will be...

The site will be transformed by replacing the existing landscape with California native plants that are drought resistant. After removal of the turf, a new and efficient irrigation system will be installed. Project Manager: [TBD] Approximate Cost: $149,312 Funding Source: Department of Water Resources Completion Year: -

Signal retiming programs have shown travel time and delay reductions of 5 to 20 percent, and in fuel savings of 10 to 15 percent nationwide. The upcoming improvements will reduce the number of accidents between vehicles, pedestrians, and bike riders at various intersections around the City by installing a signal interconnect system. This upgrade affects...

Improvements for Saratoga Park focus on modernizing the active play fields and spectator areas. Pedestrians will enjoy new walkway circulation patterns, new restrooms, a new playground and snack bar, improved parking lots, and additional amenities. Project Manager: M. Heredia Approximate Cost: $6,672,329 Funding Source: 2021 Lease Revenue Bonds [partial] Completion Year: -

The flooring of the Recreation Building at the Civic Center has aged and worn over time. The VCT flooring will be removed and replaced throughout the lobby and hallway of the Human Services and Recreation Building. Project Manager: M. Paradis Approximate Cost: $60,000 Funding Source: 2021 Lease Revenue Bonds Completion Year: -

This project includes redesign and remodel of the sleeping quarters, kitchen and ADA compliant restrooms, new locker rooms and changing areas. The remodel will also include upgrades to lighting, flooring, wall paper, paint and ceilings. Project Manager: C. Stevenson Approximate Cost: $504,107 Funding Source: 2021 Lease Revenue Bonds Completion Year: -

This project includes redesign and remodel of the sleeping quarters, new kitchen and ADA compliant restrooms, new locker rooms and changing areas. The remodel will also include upgrades to lighting, flooring, wallpaper, paint and ceilings Project Manager: C. Stevenson Approximate Cost: $554,107 Funding Source: 2021 Lease Revenue Bonds Completion Year: -

Improvements for MacArthur Park include a walking path, exercise station and other amenities including a basketball court, or pickle ball, and/or a dog park. Project Manager: M. Heredia Approximate Cost: $4,579,640 Funding Source: 2021 Lease Revenue Bonds Completion Year: -

Some of the proposed improvements include new landscaping and efficient irrigation, enhanced concrete paving, decorative pavers, ADA ramps, steps with hand railing, benches, amphitheater seating, site furniture, new bike racks, swales, a Memorial Garden reflecting pool, ADA accessible parking, and relocation of the Remembrance Plaque. The main circulation around the Civic Center currently creates confusion...

Improvements to this park may include a redesigned parking lot with new pavement and lighting, a walking loop with fitness stations, site furniture, and turf block pavers, and a new playground with inclusive play features. The basketball court and tennis courts may be relocated. There will be new bathrooms for the splash pad and a...

Close window