You can view the terms and permit conditions at this link: Transportation and Oversized Load Permit Conditions

8.16.020 A. Classification. The streets or portions thereof of the City are declared to be and are divided and classified into two groups and shall henceforth be known as and regulated as to heavy traffic by the names of such two groups, together with regulations pertaining thereto as set forth in this section. Such two groups...

Truck Route Map Arrow Highway, from the westerly City Limits to Benson Avenue; Palo Verde Street from Monte Vista Avenue to Central Avenue; Holt Boulevard, from Mills Avenue to Central Avenue; Mission Boulevard, from the westerly City Limits to Central Avenue; Monte Vista Avenue, from Palo Verde Street to the northerly City Limits; Central Avenue,...

One-Day Use permits are valid for only 24-hours for any period between 12:00am to 6:00am the next day. These limitations may vary depending on the size of the load and road conditions. If the applicant is unable to meet the proposed schedule approved on the permit, the applicant is required to contact the Public Works...

The applicant or the applicant's agent shall sign a statement agreeing to preserve and save the City, and each officer and employee thereof, from any liability or responsibility for any accident, loss or damage to persons or property happening or occurring as the proximate result of the applicant's activities pursuant to the permit for which...

12.010 No person shall move any load over, along or across any street within the City when the weight and/or size of the load, plus the weight and/or size of the vehicle or equipment, exceeds the limitations of the Vehicle Code of the State, except that, where it is impractical to change the physical characteristics...

Trucks over 17 feet high and 16 feet wide; or 75 feet long require a pilot car. One Pilot Car Any vehicle with a single kingpin combination between 75 feet and 100 feet. Any vehicle combination of truck, tractor, and jeep/semi-trailers coupled together (multi-kingpin) exceeding 120 feet. Any vehicle combination of truck, tractor, jeep, and...

Download the latest moving permit application, city ordinance information, and truck route map. One-day use transportation permits are valid for 24-hours and cost $50 per vehicle for one moving day. Annual permits cost $100 and are valid for the entire year for one vehicle. Moving permits are non-transferable. Night moves are restricted between 10pm and 6am per the City Engineer. The Public Works Director/City Engineer reserves the right to deny issuance or cancel a transportation permit if it is not in the best interest of the general public.

Project scope includes repairing ceilings, repairing walls, removing plaster, replacing drywall, installing lights, removing floor tile, electrical upgrades, kitchen remodel, and reconstructing bathrooms. Project Manager: C. Stevenson Approximate Cost: $313,502 Funding Source: Community Development Block Grant Completion Year: -

Improvements will include the installation and/or enhancement of sidewalks, bike lanes, crosswalks, ADA curbs, signage, and traffic control signage with rapid flashing beacons. These enhancements will impact Montclair High School, Montera Elementary, and Monte Vista Elementary Schools. Traffic safety measures and devices per the Manual of Uniform Traffic Control Devices (MUTCD) and signs will be...

The site will be transformed by replacing the existing landscape with California native plants that are drought resistant. After removal of the turf, a new and efficient irrigation system will be installed. Project Manager: [TBD] Approximate Cost: $149,312 Funding Source: Department of Water Resources Completion Year: -

Signal retiming programs have shown travel time and delay reductions of 5 to 20 percent, and in fuel savings of 10 to 15 percent nationwide. The upcoming improvements will reduce the number of accidents between vehicles, pedestrians, and bike riders at various intersections around the City by installing a signal interconnect system. This upgrade affects...

Improvements for Saratoga Park focus on modernizing the active play fields and spectator areas. Pedestrians will enjoy new walkway circulation patterns, new restrooms, a new playground and snack bar, improved parking lots, and additional amenities. Project Manager: M. Heredia Approximate Cost: $6,672,329 Funding Source: 2021 Lease Revenue Bonds [partial] Completion Year: -

The flooring of the Recreation Building at the Civic Center has aged and worn over time. The VCT flooring will be removed and replaced throughout the lobby and hallway of the Human Services and Recreation Building. Project Manager: M. Paradis Approximate Cost: $60,000 Funding Source: 2021 Lease Revenue Bonds Completion Year: -

This project includes redesign and remodel of the sleeping quarters, kitchen and ADA compliant restrooms, new locker rooms and changing areas. The remodel will also include upgrades to lighting, flooring, wall paper, paint and ceilings. Project Manager: C. Stevenson Approximate Cost: $504,107 Funding Source: 2021 Lease Revenue Bonds Completion Year: -

This project includes redesign and remodel of the sleeping quarters, new kitchen and ADA compliant restrooms, new locker rooms and changing areas. The remodel will also include upgrades to lighting, flooring, wallpaper, paint and ceilings Project Manager: C. Stevenson Approximate Cost: $554,107 Funding Source: 2021 Lease Revenue Bonds Completion Year: -